The objective of this protocol is to provide testing evidence that will prove that the ‘Hot Detergent and Hot PUW Generation and Distribution’ system is fit for its intended use. Testing will incorporate both installation verification and functional verification test.
Prepare a summary ‘System Description’. Suggestions include drawing a process flow/block diagram; listing critical operational features; and, describing the major equipment components in the context of their installation and functional features.